Drilling a borehole in Ghana is the most reliable way to secure an independent water supply. Done correctly — with a proper site survey and a licensed contractor — a well-sited borehole produces clean water for 20+ years. AquaProbe surveys every site before drilling, holds a valid WRC licence, and backs every borehole with a 2-year structural warranty.
Borehole Drilling Process
- Site assessment — geologist surveys your plot, marks the best drill point. Report in 48 hours.
- WRC permit — we apply for your Water Drilling Licence on your behalf. 1–2 weeks processing.
- Drilling — licensed rig advances to the aquifer. 1–3 days depending on depth and rock hardness.
- Casing — PVC or steel casing installed to WRC specification.
- Development & flushing — borehole flushed to remove drill debris.
- Pump test — actual yield measured before pump installation.
- Pump installation — submersible pump, rising main, wellhead fitted.
- Water quality test — sample sent to CSIR-accredited laboratory.
Borehole Drilling Cost in Ghana
Final price depends on depth, geology and location — confirmed after a site assessment. A site survey before drilling avoids the far bigger cost of a dry or failed borehole.
- Site assessment and drill point siting
- WRC drilling permit application
- Full drilling to target aquifer depth
- PVC or steel casing installation
- Borehole development, flushing and yield test
- Submersible pump supply and installation
- Water quality sampling and lab analysis
- WRC completion certificate and borehole log
Types of Boreholes We Drill
- Domestic — homes and compounds, 40–60m typical, submersible pump
- Commercial — offices, hotels, factories, estates
- Agricultural — irrigation boreholes, solar-powered options
- Solar — off-grid system. See solar borehole service
- Community/NGO — hand pump or motorised for schools, clinics
Ghana's Geology and Depth by Region
🌊 Coastal Sedimentary
Greater Accra, Central coast. 30–50m depth. Saline intrusion risk near coast.
⛏️ Birimian Province
Ashanti, Eastern, Western. 40–65m depth. 91% success rate when correctly sited.
🏜️ Voltaian Basin
Northern, Bono East, Oti. 25–45m depth. Fluoride risk in some areas.
🪨 Basement Complex
Upper East, Upper West. 15–40m depth. Yield varies 0.3–36.4 m³/h — siting is critical.
Why Choose AquaProbe
- WRC licensed — completion certificate with every job
- Site survey before every drill — never guess your drill point
- 2-year structural warranty + 6-month pump warranty in writing
- Pay in 2 instalments — deposit to start, balance on completion
- 24-hour after-sales response
- All 16 regions of Ghana covered